top of page
timreallifelean
May 3, 20233 min read
Real Life Lean - 008 Proper Preparation Prevents Poor Pull Plans
Happy Monday lean construction family and welcome to another edition of Real Life Lean. This newsletter is intended to give construction...
18 views0 comments
timreallifelean
Jan 6, 20233 min read
If You Tolerate It In Your Presence, It Becomes Your Standard
As a young field engineer, and as I grow in my role as a superintendent I sometimes struggle between being a stickler for quality and...
151 views0 comments
timreallifelean
Jan 1, 20233 min read
Last Planner System – An Incremental Approach to Radical Change in Your Workflow
This post was originally shared on leanconstructionblog.com and can be found here. The Last Planner System® (LPS) as a whole can...
28 views0 comments
Subscribe Today
bottom of page